A major delay to the planned Cycle bridge spanning the Black Cart is now inevitable after an incident last night at around 8.20pm
The accident happened during the lifting stage last night of the new cycling/pedestrian Bridge after the structure shifted and fell from its Mammoet transporters, Large bends to the metal can be clearly seen in the bridge this morning as well as a steel container that the bridge has fell upon crushed and a mammoet self-propelled modular unit on its side with another mammoet machine at the back also looks damaged.
Thankfully no one was Injured and no roads are blocked as it happened on the area it was originally being built upon ands in the process of being lifter into place.